The Outcome
Given a 4-week time frame for implementation after the initial engineering was completed, the installation services from both hardware team and Carrier team interacted superbly. This project was up and running with 1 Mbps down and 2 Mbps up, within a 3 week time frame. Fifteen (15) Ministries were connected from the Ministry of Information technology to the Ministry of Justice and the ministry of Finance. Even though money was too scarce to do a sight survey with Satellite photos and knowledge of RF were have received rave reviews from interim government for our results. 100% satisfied.
The Benefits
The team delivered high speed bandwidth to a third world country at a fraction of the cost that a competitor could have with more services more bandwidth and higher level of scalability by far. This solution has received rave reviews from interim government for our results. 100% satisfied. The minimum savings are $6,000 to $9,000 USD per month just on the bandwidth backhaul. The VOIP services will be in the several hundred thousand dollar ranges of savings per month.
Contact information:
John Elliott
Team Leader, Project Design and Applications Engineering
Coral Wireless and Video
1-941-745-2135
John Page
Project Coordinator
CSG
1-941-730-7304 |